Renovation and Trade Works BOQ Format

  • Excel (.xlsx)
  • 10 sheets
  • Free
  • Updated

Or download the empty Excel template

What is a renovation and trade works BOQ?

A bill of quantities for renovation, repair and single-trade work on private jobs: dismantling and repair, waterproofing, flooring and tiling, painting, MS fabrication, and POP and gypsum. Each trade has its own sheet, with plain-language items and a separate material rate and labour rate. Use only the sheets your job needs; the Abstract adds up whatever you fill in.

Building a new house instead? Use the house construction BOQ for private work.

What is in the renovation BOQ workbook?

  • Project Details — owner, site, contractor, and the contingency, profit and GST percentages.
  • Six trade sheets — Dismantling & Repair, Waterproofing, Flooring & Tiling, Painting, Fabrication (MS), and POP & Gypsum, each with suggested items and blank rows.
  • Abstract — every trade's material, labour and total, add-ons, grand total, and a count of items still missing a rate.
  • Filled Sample — a bathroom and terrace renovation, with illustrative rates.

How does the renovation BOQ sheet calculate?

  • Rate = material rate + labour rate; material amount and labour amount are quantity × each rate, rounded to the paisa, and the amount is their sum.
  • An item with a quantity but no rate shows RATE MISSING and is left out of the totals. The Abstract counts them per trade.
  • A trade sheet left blank contributes nothing to the Abstract.
  • Contingency and contractor's profit are each a percentage of the cost of works; GST is applied to the total before GST.

Worked example from the sample sheet (illustrative rates): 95 sqft of bathroom waterproofing at ₹38 material and ₹20 labour per sqft is ₹3,610 + ₹1,900 = ₹5,510. Dismantling is labour only, and the wall tiles are supplied by the owner, so those lines carry no material cost. The seven sample items come to ₹35,560 material and ₹26,540 labour — ₹62,100 in all.

How do you use the renovation BOQ template?

  1. Fill in Project Details.
  2. Open only the trade sheets your job needs. Overwrite or delete the suggested items and add your own; leave the other sheets empty.
  3. Enter quantity, material rate and labour rate. For labour-only work or owner-supplied material, enter 0 as the material rate.
  4. Clear every RATE MISSING line, then check the Abstract.

What should you check before relying on the renovation BOQ?

  • No rates are supplied. Enter current rates from quotations for your city and specification; any figures on the sample sheet are illustrative only and must not be used for real estimating or billing.
  • In renovation the scope is the risk. Write into each description what is removed, what is re-used, the product and number of coats, and who carts away the debris.
  • Agree how work found only after dismantling will be measured and paid, before work starts.
  • Structural repair must follow an engineer's design; this BOQ only prices it.

Which BOQ template do I need?

Your jobUse this template
Government, PWD or public-sector tender priced from a schedule of rates BOQ Format in Excel
New house or builder floor, private work — turnkey or labour contract House Construction BOQ Format in Excel (Private Work)
Renovation or repair mixing several trades: dismantling, waterproofing, tiling, painting, fabrication, POP Renovation & Trade Works BOQ Format in Excel (this page)
Only waterproofing: terrace, toilets, basement or water tank Waterproofing BOQ Format in Excel
Only flooring and tiling: tiles, stone, skirting and dado Flooring & Tiling BOQ Format in Excel
Only painting: interior, exterior, steel and woodwork Painting BOQ Format in Excel
Only the boundary wall and gate Boundary Wall BOQ Format in Excel
Office, shop or home interior fit-out Interior Work BOQ Format in Excel
Only plumbing and sanitary work Plumbing & Sanitary BOQ Format in Excel
Only internal electrical work Electrical BOQ Format in Excel
A building's fire-fighting system: pumps, hydrants, sprinklers, extinguishers Fire Fighting BOQ Format in Excel
A road, pavement or internal road Road Work BOQ Format in Excel
Adding several BOQs up into one project total Abstract of Cost Format in Excel

What does each column mean?

ColumnWhat goes in it
Description of itemPlain-language item, as it will be agreed with the contractor. Write in what the rate includes — shuttering, curing, material make, debris removal.
UnitAs local contractors quote it: sqft, cft, rft, kg, nos, LS. Editable — keep the quantity and the rate in the same unit.
QuantityMeasured from your drawings or on site.
Material rate (Rs.)Entered by you, per unit. 0 where the owner supplies the material or the contract is labour only.
Labour rate (Rs.)Entered by you, per unit.
Rate (Rs.)Auto-calculated. Material rate + labour rate. Blank if neither is entered.
Material / Labour amount (Rs.)Auto-calculated. Quantity x each rate, rounded to the paisa, so the material and labour shares are always visible.
Amount (Rs.)Auto-calculated. Material amount + labour amount.
CheckRATE MISSING when a quantity has no rate (the line is left out of the totals, never counted as zero); QTY MISSING for the reverse.

Everything in this band is priced on a bill of quantities. The BOQ format in Excel is that bill — pre-sectioned by trade, with an abstract that totals it — and every rate you settle here is applied against its measured quantities.

Get the quantities from your drawings

A template gives you the structure. The measuring — scaling every quantity off the drawing set — is still three to seven days of work. Upload your architectural and structural PDFs and InstaBOQ reads the drawings, extracts the quantities, and fills this same structure.

Questions

Why is there one workbook for all the trades?

Because renovation jobs usually mix trades, and one workbook keeps them in one total: fill only the sheets you need and the Abstract ignores the empty ones. For a job that is a single trade on its own, there are separate waterproofing, flooring and tiling, and painting BOQs.

How do I price work where the owner supplies the material?

Enter 0 as the material rate and the agreed labour rate. The line then bills labour only, and the Abstract shows material and labour separately.

How is dismantling measured?

Usually by the area or volume of what is removed — square feet of tiles or plaster, cubic feet of brickwork — or by number for doors and windows. Agree the method before work starts, because the quantity cannot be re-measured once the material has gone.

How much contingency should a renovation carry?

There is no standard figure. Renovation hides more surprises than new work, which is why the template starts at 5% — a placeholder to replace with the figure you agree.

Does it cover structural repairs?

It can price them, but the repair itself must follow a structural engineer's design. Describe that design in the item before asking for a rate.

Does the template include rates?

No. Enter rates from quotations for your city and specification. The figures on the sample sheet are illustrative only.

Next in your work

Fill a BOQ item by item in your browser and export it to Excel. Free to start.