Skip to content

Bill of Quantities Format for Flooring and Tiling

  • Excel (.xlsx)
  • 5 sheets
  • Free
  • Updated

Or download the empty Excel template

What is a flooring and tiling BOQ?

A flooring and tiling BOQ is a bill of quantities for floors and wall tiles: the base and bedding, tile flooring and skirting, dado tiles, granite, marble and kota stone, concrete and paver floors, and joints and polishing. Each item has a unit, a measured quantity and a rate, and the sections add up to the package cost.

Doing several trades in one renovation? The renovation and trade works BOQ keeps them in one workbook with separate material and labour rates.

What is in the flooring and tiling BOQ workbook?

  • Project Details — name of work, parties, drawing and tender references, the source of your rates, and the add-on percentages.
  • BOQ — suggested items in six sections — base and bedding, tile flooring, wall tiling, stone flooring, concrete and external floors, joints and finishing — with blank rows for your own.
  • Abstract — every section's total, the add-ons and the total estimated cost, with a count of items still missing a rate.
  • Filled Sample — a worked example with illustrative quantities and rates.

How does the flooring and tiling BOQ sheet calculate?

  • Amount = ROUND(quantity × rate, 2). An item with a quantity and no rate shows RATE MISSING and adds nothing, so a missing rate is never mistaken for a nil one.
  • Section sub-total = the sum of its amounts, with a count of items still without a rate.
  • Abstract: cost of works = the sum of the sections; contingencies and contractor's profit and overheads are each a percentage of the cost of works; GST is a percentage of the total before GST. Every percentage starts at 0.

Worked example from the sample sheet: floors, skirting, dado and a granite lobby for a two-bedroom flat come to Rs. 1,41,260 before add-ons. Tile flooring is the largest section at Rs. 85,960, including 58 rmt of skirting at Rs. 220.

How do you use the flooring and tiling BOQ template?

  1. Fill in Project Details, including where your rates come from and any add-on percentages.
  2. On the BOQ sheet, overwrite or delete the suggested items and add your own in the blank rows of each section.
  3. Enter the measured quantity and the rate for each item. An item with a quantity and no rate shows RATE MISSING and is left out of the totals.
  4. Check the Abstract: section totals, add-ons, the total, and the count of items still without a rate.

What should you check before relying on the flooring and tiling BOQ?

  • No rates are supplied. Price from current quotations or the schedule of rates your contract names, and record the source; the rates on the Filled Sample are illustrative only.
  • Say in each description whether the tile or stone is supplied by the contractor or by the owner. A rate for laying only is very different from one that includes the material.
  • Skirting is measured in running metres, separately from the floor area.

Which BOQ template do I need?

Your jobUse this template
Government, PWD or public-sector tender priced from a schedule of rates BOQ Format in Excel
New house or builder floor, private work — turnkey or labour contract House Construction BOQ Format in Excel (Private Work)
Renovation or repair mixing several trades: dismantling, waterproofing, tiling, painting, fabrication, POP Renovation & Trade Works BOQ Format in Excel
Only waterproofing: terrace, toilets, basement or water tank Waterproofing BOQ Format in Excel
Only flooring and tiling: tiles, stone, skirting and dado Flooring & Tiling BOQ Format in Excel (this page)
Only painting: interior, exterior, steel and woodwork Painting BOQ Format in Excel
Only the boundary wall and gate Boundary Wall BOQ Format in Excel
Office, shop or home interior fit-out Interior Work BOQ Format in Excel
Only plumbing and sanitary work Plumbing & Sanitary BOQ Format in Excel
Only internal electrical work Electrical BOQ Format in Excel
A building's fire-fighting system: pumps, hydrants, sprinklers, extinguishers Fire Fighting BOQ Format in Excel
A road, pavement or internal road Road Work BOQ Format in Excel
Adding several BOQs up into one project total Abstract of Cost Format in Excel

What does each column mean?

ColumnWhat goes in it
S. No.Section letter and item number, for example B.2.
Description of ItemWhat is to be done, in tender style. Write in the product, thickness, grade or number of coats your specification calls for.
UnitThe unit of measurement: sqm, rmt, cum, nos, set or job.
QuantityThe measured quantity in that unit.
Rate (Rs.)Your rate per unit, from quotations, a schedule of rates or your own analysis. None is supplied.
Amount (Rs.)Auto-calculated. Quantity × rate, rounded to two decimals.
CheckAuto-calculated. RATE MISSING or QTY MISSING when only one of the two is entered.

Everything in this band is priced on a bill of quantities. The BOQ format in Excel is that bill — pre-sectioned by trade, with an abstract that totals it — and every rate you settle here is applied against its measured quantities.

Get the quantities from your drawings

A template gives you the structure. The measuring — scaling every quantity off the drawing set — is still three to seven days of work. Upload your architectural and structural PDFs and InstaBOQ reads the drawings, extracts the quantities, and fills this same structure.

Questions

How is flooring measured in a BOQ?

By the area actually laid, in square metres. Skirting is measured separately in running metres, and staircase treads and risers as described in the item. Follow your contract's method of measurement for deductions.

Should the tile price be included in the flooring rate?

Say which. A supply-and-lay rate includes the tiles, bedding, grout and labour; a laying-only rate covers the work when the owner buys the tiles. The description should make it clear so quotations can be compared.

What is the difference between laying tiles on mortar and on adhesive?

On a cement mortar bed the tile sits in a thick bed that also takes up level differences. Tile adhesive is a thin bed over an already level surface, which suits large-format tiles and tiling over an existing floor. They are priced as separate items.

Is skirting included in the floor area?

No. Skirting is a separate item measured in running metres along the walls, usually at a set height such as 100 mm.

When should I use the renovation BOQ instead?

When the job mixes trades, such as a kitchen or bathroom renovation that also has dismantling, waterproofing and painting. The renovation and trade works BOQ keeps them in one workbook.

Next in your work

Fill a BOQ item by item in your browser and export it to Excel. Free to start.