Bill of Quantities Format for Plumbing and Sanitary Works

  • Excel (.xlsx)
  • 5 sheets
  • Free
  • Updated

Or download the empty Excel template

What is a plumbing and sanitary BOQ?

A plumbing and sanitary BOQ is a Bill of Quantities for the plumbing package: water supply piping, sanitary fixtures and fittings, soil and waste drainage, external drainage, and water storage and pumping. You enter measured quantities and rates; amounts, section sub-totals and an abstract calculate from them.

What is in the plumbing BOQ workbook?

  • Project Details — project particulars, the schedule of rates adopted, and the percentages used on the Abstract.
  • BOQ — the item list. Enter quantity and rate; amounts and sub-totals calculate.
  • Abstract — section sub-totals pulled from the BOQ, plus contingencies, establishment, overheads and GST, giving the total estimated cost.
  • Filled Sample — a G+2 residential building with 12 toilets, worked through with illustrative figures.

How does the plumbing BOQ sheet calculate?

  • Amount = quantity × rate, rounded to the paisa. It stays blank until both are entered, so a missing rate never shows as a silent ₹0.
  • Section sub-totals carry into the Abstract sheet automatically.
  • Contingencies, work-charged establishment and contractor's profit & overheads are each the cost of works × their percentage — all charged on the cost of works, not on each other.
  • GST = total before GST × the GST rate, and the total estimated cost is the total before GST plus GST.

Worked example from the sample sheet (illustrative rate): 185 running metres of 15 mm CPVC pipe at ₹285 per metre gives an amount of ₹52,725.

How do you use the plumbing BOQ template?

  1. Open Project Details and enter the project particulars, the schedule of rates you are using, and the add-on percentages for the Abstract.
  2. Go to the BOQ sheet. Item descriptions and units are already filled in — enter your measured quantity and your rate against each item in the yellow cells.
  3. Delete any item that does not apply, and insert new rows inside the relevant section, above its sub-total row.
  4. Check the Abstract sheet. It is already linked to the BOQ — nothing to type there.
  5. Look at the Filled Sample if you are unsure what belongs in a column.
  6. Print or export to PDF. Header rows repeat on every printed page.

What should you check before relying on the plumbing BOQ?

  • Sanitary fixture items must name the approved make and model before going out to tender. Fixture prices vary several fold between brands, so a rate against an unnamed fixture is not comparable across bidders.
  • Check whether the item rate is to include testing, chasing and making good — practice differs between departments and private clients.
  • External drainage beyond the building line is often measured separately under a civil or external-development BOQ. Confirm the boundary of scope before pricing.
  • Rates are not supplied with this template. Enter rates from your own schedule of rates or market quotations; any figures on the sample sheet are illustrative only and must not be used for real estimating or billing.

Which BOQ template do I need?

Your jobUse this template
Government, PWD or public-sector tender priced from a schedule of rates BOQ Format in Excel
New house or builder floor, private work — turnkey or labour contract House Construction BOQ Format in Excel (Private Work)
Renovation or repair mixing several trades: dismantling, waterproofing, tiling, painting, fabrication, POP Renovation & Trade Works BOQ Format in Excel
Only waterproofing: terrace, toilets, basement or water tank Waterproofing BOQ Format in Excel
Only flooring and tiling: tiles, stone, skirting and dado Flooring & Tiling BOQ Format in Excel
Only painting: interior, exterior, steel and woodwork Painting BOQ Format in Excel
Only the boundary wall and gate Boundary Wall BOQ Format in Excel
Office, shop or home interior fit-out Interior Work BOQ Format in Excel
Only plumbing and sanitary work Plumbing & Sanitary BOQ Format in Excel (this page)
Only internal electrical work Electrical BOQ Format in Excel
A building's fire-fighting system: pumps, hydrants, sprinklers, extinguishers Fire Fighting BOQ Format in Excel
A road, pavement or internal road Road Work BOQ Format in Excel
Adding several BOQs up into one project total Abstract of Cost Format in Excel

What does each column mean?

ColumnWhat goes in it
S. No.Item number within its section. Sections are lettered; items run A.1, A.2, and so on.
Description of ItemThe full specification, pre-filled to common practice. For a departmental tender, replace it with the exact wording of that department's schedule — the wording governs what the rate is deemed to cover.
Unitcum, sqm, rmt, point, nos, kg — as the item is measured. The rate must be quoted in the same unit.
QuantityYour measured quantity from the drawings. This template does not calculate quantities.
Rate (Rs.)Your rate for the item, from your own schedule of rates or a supplier quotation. Record the basis on the Project Details sheet.
Amount (Rs.)Auto-calculated. Quantity x Rate, carried into the section sub-total and the Abstract.

Everything in this band is priced on a bill of quantities. The BOQ format in Excel is that bill — pre-sectioned by trade, with an abstract that totals it — and every rate you settle here is applied against its measured quantities.

Get the quantities from your drawings

A template gives you the structure. The measuring — scaling every quantity off the drawing set — is still three to seven days of work. Upload your architectural and structural PDFs and InstaBOQ reads the drawings, extracts the quantities, and fills this same structure.

Questions

What does a plumbing and sanitary BOQ include?

Water supply piping and valves, sanitary fixtures and fittings, soil, waste and drainage, and water storage and pumping. This template has pre-written items in those four sections.

How are plumbing pipes measured in a BOQ?

In running metres along the length of the pipe. Whether fittings, clamps, cutting and testing are included in the pipe rate must be stated in the item description, as it is in this template's items.

Which Indian standards apply to plumbing work?

IS 1172 sets basic requirements for water supply, drainage and sanitation, and Part 9 of the National Building Code covers plumbing services. The specification in your contract takes precedence.

Why name the make of sanitary fixtures?

Fixture prices vary several-fold between brands and ranges. A rate against an unnamed WC or basin is not comparable between bidders.

Is external drainage part of the plumbing BOQ?

Often not. Drainage beyond the building line is frequently measured under a civil or external development BOQ. Confirm the scope boundary before pricing.