Bill of Quantities Format for Internal Electrical Works

  • Excel (.xlsx)
  • 5 sheets
  • Free
  • Updated

Or download the empty Excel template

What is an electrical work BOQ?

An electrical work BOQ is a Bill of Quantities for internal electrical installation: point wiring, conduit and cabling, distribution boards and protective devices, light fittings and fans, and earthing and lightning protection. You enter measured quantities and rates; amounts, section sub-totals and an abstract calculate from them.

What is in the electrical BOQ workbook?

  • Project Details — project particulars, the schedule of rates adopted, and the percentages used on the Abstract.
  • BOQ — the item list. Enter quantity and rate; amounts and sub-totals calculate.
  • Abstract — section sub-totals pulled from the BOQ, plus contingencies, establishment, overheads and GST, giving the total estimated cost.
  • Filled Sample — a G+2 residential building, 3 flats per floor, worked through with illustrative figures.

How does the electrical BOQ sheet calculate?

  • Amount = quantity × rate, rounded to the paisa. It stays blank until both are entered, so a missing rate never shows as a silent ₹0.
  • Section sub-totals carry into the Abstract sheet automatically.
  • Contingencies, work-charged establishment and contractor's profit & overheads are each the cost of works × their percentage — all charged on the cost of works, not on each other.
  • GST = total before GST × the GST rate, and the total estimated cost is the total before GST plus GST.

Worked example from the sample sheet (illustrative rate): 86 light points at ₹985 per point gives an amount of ₹84,710.

How do you use the electrical BOQ template?

  1. Open Project Details and enter the project particulars, the schedule of rates you are using, and the add-on percentages for the Abstract.
  2. Go to the BOQ sheet. Item descriptions and units are already filled in — enter your measured quantity and your rate against each item in the yellow cells.
  3. Delete any item that does not apply, and insert new rows inside the relevant section, above its sub-total row.
  4. Check the Abstract sheet. It is already linked to the BOQ — nothing to type there.
  5. Look at the Filled Sample if you are unsure what belongs in a column.
  6. Print or export to PDF. Header rows repeat on every printed page.

What should you check before relying on the electrical BOQ?

  • Point wiring rates normally include the conduit within the point. Check whether your schedule measures conduit separately, or you will pay for it twice.
  • Name the approved make for switchgear, cables and fittings before issuing for tender. Rates against unnamed products are not comparable.
  • Earthing requirements are governed by IS 3043 and by the local electricity authority. Confirm the number and type of electrodes required for your installation before pricing.
  • The service connection, meter and any transformer or DG set are usually outside this BOQ. Confirm the scope boundary.
  • Rates are not supplied with this template. Enter rates from your own schedule of rates or market quotations; any figures on the sample sheet are illustrative only and must not be used for real estimating or billing.

Which BOQ template do I need?

Your jobUse this template
Government, PWD or public-sector tender priced from a schedule of rates BOQ Format in Excel
New house or builder floor, private work — turnkey or labour contract House Construction BOQ Format in Excel (Private Work)
Renovation or repair mixing several trades: dismantling, waterproofing, tiling, painting, fabrication, POP Renovation & Trade Works BOQ Format in Excel
Only waterproofing: terrace, toilets, basement or water tank Waterproofing BOQ Format in Excel
Only flooring and tiling: tiles, stone, skirting and dado Flooring & Tiling BOQ Format in Excel
Only painting: interior, exterior, steel and woodwork Painting BOQ Format in Excel
Only the boundary wall and gate Boundary Wall BOQ Format in Excel
Office, shop or home interior fit-out Interior Work BOQ Format in Excel
Only plumbing and sanitary work Plumbing & Sanitary BOQ Format in Excel
Only internal electrical work Electrical BOQ Format in Excel (this page)
A building's fire-fighting system: pumps, hydrants, sprinklers, extinguishers Fire Fighting BOQ Format in Excel
A road, pavement or internal road Road Work BOQ Format in Excel
Adding several BOQs up into one project total Abstract of Cost Format in Excel

What does each column mean?

ColumnWhat goes in it
S. No.Item number within its section. Sections are lettered; items run A.1, A.2, and so on.
Description of ItemThe full specification, pre-filled to common practice. For a departmental tender, replace it with the exact wording of that department's schedule — the wording governs what the rate is deemed to cover.
Unitcum, sqm, rmt, point, nos, kg — as the item is measured. The rate must be quoted in the same unit.
QuantityYour measured quantity from the drawings. This template does not calculate quantities.
Rate (Rs.)Your rate for the item, from your own schedule of rates or a supplier quotation. Record the basis on the Project Details sheet.
Amount (Rs.)Auto-calculated. Quantity x Rate, carried into the section sub-total and the Abstract.

Everything in this band is priced on a bill of quantities. The BOQ format in Excel is that bill — pre-sectioned by trade, with an abstract that totals it — and every rate you settle here is applied against its measured quantities.

Get the quantities from your drawings

A template gives you the structure. The measuring — scaling every quantity off the drawing set — is still three to seven days of work. Upload your architectural and structural PDFs and InstaBOQ reads the drawings, extracts the quantities, and fills this same structure.

Questions

What is point wiring in an electrical BOQ?

Point wiring is the wiring from a switchboard to a light, fan or socket outlet, measured and paid per point. What a point includes, such as conduit, cable, switch and box, is defined by the item description, so read it before pricing.

How can conduit be paid for twice?

Point wiring rates usually include the conduit within the point. If conduit is also measured as a separate item, the same conduit is paid twice. Check how your schedule measures it.

Which Indian standards apply to internal electrical work?

IS 732 is the code of practice for electrical wiring installations, and IS 3043 covers earthing. The local electricity authority's requirements also apply.

What does FRLS mean in cable specifications?

Flame Retardant Low Smoke. FRLS cables resist the spread of fire and emit less smoke when they burn, which is why they are specified for concealed wiring in buildings.

Are the service connection and meter included?

Usually not. The service connection, meter and any transformer or DG set are normally outside the internal electrical BOQ. Confirm the scope boundary.