InstaBoQ
  • BOQ Estimator
  • Material Rates

Guides

Practical, no-fluff references on BOQ preparation, DSR 2023 rates, and residential construction estimating — written for architects and contractors.

  • How to make a BOQ from architectural drawings

    Learn how to prepare a Bill of Quantities from architectural drawings — earthwork to finishes, step by step. Price on DSR 2023 or local market rates.

    Updated 23 Jul 2026

  • BOQ format for house construction (with a worked example)

    The standard BOQ format for residential construction, with a full worked example for a 1,200 sqft house priced on both DSR 2023 and local market rates.

    Updated 23 Jul 2026

InstaBoQ

Built by architects, for architects.

Guides BOQ Estimator Material Rates

Rates sourced from CPWD DSR 2023 · No spam. No phone calls. No hidden charges.

Residential BOQ estimate based on CPWD DSR 2023 rates (incl. GST). Calculations use standard residential thumb rules and isolated footing foundation. Excludes MEP services, interior finishes, external development, compound wall, and contractor overhead. For approximate client-side budgeting only — final BOQ should be prepared by a qualified structural consultant and civil engineer.