Residential BOQ Estimator
Calculations based on typical residential building assumptions and CPWD DSR 2023 rates.
Isolated footing foundation · Imperial units (sqft / ft)
Cost breakdown by section
Residential BOQ estimate based on CPWD DSR 2023 rates (incl. GST). Calculations use
standard residential thumb rules and isolated footing foundation. Excludes MEP services,
interior finishes, external development, compound wall, and contractor overhead. For
approximate client-side budgeting only — final BOQ should be prepared by a qualified
structural consultant and civil engineer.
Rates last updated: —